Monday, November 11, 2013

Stained glass

There are two internal doors where we wanted to have glass panels - one at the end of the hallway and one directly opposite that door which used to be the back door but now is the door through to the open plan kitchen/living/dining. My original thought was to simply put some plain-ish frosted glass in the panels. However when the builder sent me to his door supplier to check out the options I got talking to one of the guys there who suggested we could have bespoke stained panels made to match/complement the existing stained glass at the front door. Genius. So I emailed a couple of pictures which were forwarded to the stained glass guy with a couple of thoughts (like remove the pattern section at the bottom) and after approving the (very) slightly revised design, a few weeks later we had the panels. The stained glass guy was so happy with how they had come up he asked for pictures of them installed and these are the pictures I sent. We're pretty happy with them, too!

The front door (from the inside - prior to painting.

The detail of the panel which was to be the basis for the design

The final panels installed. 

Looking back towards the front door

Thursday, October 24, 2013

Moving in

The photos don't seem to illustrate just how much stuff there actually is. SO much stuff. So many boxes. Odds and ends of furniture Nick and I have somehow accumulated since our student days, a few things we bought after we did the extension in 2005, and on top of that, stuff we bought in London. I've been peeking in the odd box as I try to sort them into some semblance of order and I can't believe the things I've kept. Old university notes, my student diaries from high school! Things I made in Metalwork and Woodwork. Suffice to say there is going to be a major clearout which I'm quite looking forward to. I'm desperate to get rid of all the excess stuff. I can feel it weighing me down. 




Sunday, October 20, 2013

More Tuck Pointing, Lights and Floors

Although there's still bits and pieces to do outside and a couple of things inside (some due to delays on our part), the builders officially kind of finished on Friday. Exciting, though lots to do in the next 2 weeks before we move in, so a little bit daunting too. Anyway, here's an update of what's happened in the last couple of weeks - 

The tuck pointing is finished. It looks amazing. 


New light fittings! It's hard to get the detail in the pictures, but they are frosted with a pattern around the middle. 

You can kind of see it here. This is the living room which has extra down lights too.

The painting is pretty much done too. The robes look fantastic.

And the floors! We're so happy with how they've come up. New door handles, too. 


Monday, October 07, 2013

Painting and Tuck Pointing

The painting started at the end of last week and this is just the undercoat but I love it. It's made such a huge difference (compared to the unfinished wood/robes/mantles - like in this and this picture). Since I took these pictures I've seen some of the rooms finished and they look fantastic. It's been amazing to see what a difference the tuck pointing makes too. Nick was always keen to get the tuck pointing done but I was a bit sceptical (mostly because of the eye-watering cost) but it looks so good. Apparently people stop in front of the house every day asking about it. Can't wait to see it finished. 

The front door has never been painted - I love how the lead-lighting looks against the white. 

The arch (have I posted enough pictures of the arch yet?)

Robes and mantel - suddenly looking like they are meant to be in the room. 


Tuck pointing - the far left side under the verandah. I particularly love how the yellow bricks come up.

Above the windows - before (right) and after (left)




Wednesday, October 02, 2013

Brick Cleaning

Now that the inside is mostly sorted, the work on the front is starting to happen. Last week the bricks were cleaned which removed probably 100+ years of dirt and grime, some bleeding of the darker bricks on to the lighter ones (but not all of it), as well as the white paint covering the bluestone lintels and footings. It's likely that the paint was not an original feature and we much prefer the bluestone. The tuck pointing is booked to start next week and then the verandah roof will be replaced and everything will be painted. We haven't got around to sorting the front fence yet, but that's next on my list. 


Thursday, September 26, 2013

Wardrobes and Fireplaces

We're definitely down to the business end. In the last week our built-in-robes were installed and then the fireplaces went in. The plasterers completed the arch in the hallway, put up all the ceiling roses, and put a skim coat over all the walls. The builders have been finishing the skirting boards (they needed to wait for the robes and fireplaces to be finished first) and other various bits and pieces. In the next week the electrician will come to finish off, the tiling will be done in the second bathroom and the painter will start. I also got the quotes on the blinds this week and have scheduled a time for them to be installed. Three weeks until the work is all done and about five weeks until we're back in. Hooray!

Robes in Milo & Henry's room

Robes in our bedroom

And with fireplace installed in our bedroom (robe doors and mantel all to be painted white)

Fireplace in Ivy's room. Hard to tell but the tiles are green.

Fireplace in Milo & Henry's room. Insert/tiles were installed by Nick 10 years ago, new (slightly narrower) mantel.

Marble mantel with gas fireplace in living room. 

Completed arch!

Sunday, September 15, 2013

Deck, corbels and architrave

We are definitely getting closer to the finish now although it feels like there is still loads to do. The builders have 5 more weeks which will basically be 3 weeks of finishing up, then a week and a bit of painting, then a few days for floor sanding. Hopefully at the same time we can have the side fence replaced (the brush fence in the first picture below) and have the backyard landscaped. 

The new bumper sized deck (not quite finished yet)

Step down from deck to side access

New corbels and capping

These corbels match some stone ones at the front of the house

New door (this one and one other will have stained glass panels), plus new skirting and architraves

New window architraves too


Tuesday, September 03, 2013

Plaster & tiles

There has been lots of progress over the last week. I'm starting to count down until we're back in the house (2 months!)

Tiling in the bathroom. The vanity is from when we did the bathroom in 2003(?) - I still love it. 

Shower. We changed the colours from burgundy/white to black/white as it was impossible to source the right colour burgundy (it seems you can only get a really pinky burgundy now, not the rich, dark burgundy we had before.) But I'm really liking the black/white. 

New cornice in the 'green' room. The hole in the ceiling is where the attic access goes. 

And another hole next to it for the evaporative cooling vents. Unfortunately it's not pretty, but worth it, I think. 
 
Cornice in the hallway.

And looking towards the front door. 

We received our delivery of fireplaces yesterday. Three new ones to put in (two decorative, one with gas fire insert). 

Wednesday, August 21, 2013

Progress

The last few weeks have been pretty quiet at Bridge Street. Just finishing up the demolition, some electrical work and a few other bits and pieces (like fixing the brick work over the front door). This week seems to be a bit of a turning point. The plasterers have started and the deck is getting rebuilt (bigger and better and child-safe). It's all starting to come (back) together...

Plaster board for the hallway, the 'green' room and two ceilings

Plaster up in the hallway

Plaster in the 'green' room

Waterproofing (I think?) in the bathroom


New windows in the front room

New deck